Brioche Pasquier, Milton Keynes

A new drainage system was needed inside the huge Brioche Pasquier bread factory in Milton Keynes and, up until Kelsey Plant Hire received a telephone call, the contractors had started the project using a 5 tonne excavator with a diesel exhaust filter system. The metres of piping from the exhaust trailed across the factory floor and out of the open doorway. However, soon after work commenced, the factory manager called everything to a complete halt as emissions were detected past the tall temporary screening.

Kelsey Plant Hire provided the complete solution the very next day, delivering a Takeuchi TB216H 1.9 tonne hybrid mini digger and an Ecovolve ED1000 fully electric 1 tonne skiploader.

Work recommenced emission free and the job was completed within two and a half weeks.